Requirements for Qatar & Oman for various Shutdown Projects
Starting by next month 2024
LARGE NUMBER REQUIREMENTS
Mechanical
Superintendent Mechanical
Planner – mechanical
Shutdown Manager
Shutdown Engineer
Supervisor – Valve
Supervisor – mechanical
Foreman – Mechanical
Foreman – Valve
Fitter – Mechanical
Fitter – general
Column Technician
BA/ Catalyst Technicians
Re-Tubing Technician
Bolt Torquing Technician
Catalyst -Ground Support
Steam Boiler Operator
Bundle puller Operator
HP Jetters / Operators
Piping
Superintendent Piping
Supervisor – Piping
Supervisor – Hydrotest
Foreman-pipe
Fabricator pipe
Fitter Pipe
Asst. pipe fitter
QA/QC
QA/QC Inspector – Static
QA/QC Inspector – Welding/piping
QA/QC Inspector – Painting/coating
Painting & Coating
Coating/Blasting Supervisor
Blaster/ Painter
Blasters (Certified)
Coating Tech (Certified)
E&I
Supervisor – Electrical
or – Instrument
Foreman – Electrical
Foreman – Instrument
Electrical technician
Instrument technician
Instrument Fitter
Ⓡ
SHORTLISTING IS
IN THE PROCESS
SEAGULL INTERNATIONAL MUMBAI
seagullshutdownproject@gmail.com
+91-22-4616 2271/72/73, 8976964261
SEAGULL Ruby Coach Lane, Off. Andheri-Kurla Road,
4th Floor, Wellington Business Park II,
Marol, Andheri (E), Mumbai